How to Calculate Cubic Yards (Step by Step, With Examples)

To calculate cubic yards, multiply length × width × depth in feet, then divide by 27. For example, a 10 ft × 10 ft slab 3 inches deep is 10 × 10 × 0.25 = 25 cubic feet, and 25 ÷ 27 = 0.93 cubic yards — so you order 1 cubic yard.

Ordering concrete, soil, mulch, or gravel starts with one question: how many cubic yards do I need? Order too little and the truck has to come back — or worse, your slab sets halfway through the pour. Order too much and you have paid for material you will never use. The good news is that the calculation itself takes less than a minute once you know the two conversions that trip most people up: inches to feet, and cubic feet to cubic yards. A free cubic yard calculator does the arithmetic instantly, but knowing the steps means you can check its answer and catch a measurement mistake before it costs you money.

What Is a Cubic Yard?

A cubic yard is a cube that measures 3 feet long, 3 feet wide, and 3 feet high. Because 3 × 3 × 3 = 27, one cubic yard equals 27 cubic feet. That single number — 27 — is the whole secret of the calculation: everything you measure in cubic feet becomes cubic yards when you divide by 27.

Picture it this way: a cube 3 ft × 3 ft × 3 ft holds exactly 1 cubic yard. Fill that cube with concrete, soil, or mulch and you have ordered 1 cubic yard.

Cubic yards are also the unit that bulk suppliers use for soil, mulch, gravel, and sand. Bagged products, by contrast, are usually sold by the cubic foot — a standard bag of mulch holds 2 cubic feet, for example — so converting between the two units is a skill you will use on almost every landscaping project.

What Is the Formula for Cubic Yards?

The formula for a rectangular area is:

Cubic yards = (Length in feet × Width in feet × Depth in feet) ÷ 27

Three things to get right before you plug numbers in:

  1. All three measurements must be in feet. Length and width usually already are, but depth is almost always measured in inches — a slab is 3 or 4 inches deep, not 0.25 or 0.33 feet. Divide inches by 12 to convert: 3 inches = 0.25 feet, 4 inches = 0.33 feet, 6 inches = 0.5 feet.
  2. Multiply first, divide last. Length × width × depth gives you cubic feet. Only then do you divide by 27 to get cubic yards.
  3. Round up, never down. If the answer is 0.93 cubic yards, you order 1. Concrete suppliers deliver in half-yard increments at best, and running short mid-pour is far more expensive than a small excess.

If you would rather skip the arithmetic, a free cubic yards calculator runs the same formula for rectangles, circles, and irregular shapes — but the worked examples below show every step, so you can verify any result by hand.

How to Calculate Cubic Yards, Step by Step

Follow these five steps for any rectangular slab, patio, garden bed, or driveway.

Step 1: Measure the length and width in feet

Measure the longest side and the shortest side of the area in feet. For a slab that is 10 feet by 10 feet, the length is 10 and the width is 10. If your tape measure gives inches, divide by 12: 120 inches = 10 feet. Write both numbers down before moving on — most calculation errors start with a misread tape.

Step 2: Measure the depth in inches and convert to feet

Measure how deep the material will sit. A patio slab is usually 4 inches deep; a garden bed might be 12 inches deep. Convert inches to feet by dividing by 12:

Depth in inchesDepth in feet
2 inches0.17 feet
3 inches0.25 feet
4 inches0.33 feet
6 inches0.50 feet
12 inches1.00 feet

This is the step people get wrong most often. Using 3 instead of 0.25 in the formula inflates the answer twelvefold — the difference between ordering 1 cubic yard and ordering 12.

Step 3: Multiply length × width × depth

Multiply the three numbers together. The result is the volume in cubic feet. For our example slab: 10 × 10 × 0.25 = 25 cubic feet.

Step 4: Divide by 27

Divide the cubic feet by 27 to convert to cubic yards. For the example: 25 ÷ 27 = 0.93 cubic yards.

Step 5: Round up and add a waste allowance

Round the answer up to the nearest orderable amount, and add 5–10% for waste, spillage, and uneven ground. For the example slab, 0.93 cubic yards rounds up to 1 cubic yard — and with a 10% allowance, 0.93 × 1.10 = 1.02, which still rounds to 1 cubic yard. For larger pours the allowance matters more: on a 3.70 cubic yard patio it adds 0.37 cubic yards, which can be the difference between finishing the pour and calling the truck back.

Worked Example 1: A 10 ft × 10 ft Slab, 3 Inches Deep

This is the classic small-slab calculation, and it is the one to memorise:

  1. Depth in feet: 3 inches ÷ 12 = 0.25 feet.
  2. Volume in cubic feet: 10 × 10 × 0.25 = 25 cubic feet.
  3. Volume in cubic yards: 25 ÷ 27 = 0.93 cubic yards.
  4. Order: round up to 1 cubic yard.

One cubic yard covers this slab with a small margin to spare. If you are mixing bagged concrete instead of ordering ready-mix, 25 cubic feet needs 56 bags of 60-lb concrete mix (each 60-lb bag yields about 0.45 cubic feet: 25 ÷ 0.45 = 55.6, rounded up to 56).

Worked Example 2: A 20 ft × 15 ft Patio, 4 Inches Deep

A patio is the most common cubic-yard calculation for homeowners, and 4 inches is the standard slab depth:

  1. Depth in feet: 4 inches ÷ 12 = 0.33 feet.
  2. Volume in cubic feet: 20 × 15 × 0.33 = 100 cubic feet.
  3. Volume in cubic yards: 100 ÷ 27 = 3.70 cubic yards.
  4. Waste allowance: 3.70 × 1.10 = 4.07 cubic yards.
  5. Order: round up to 4.5 cubic yards.

Notice how the waste allowance changes the order here: without it you would order 4 cubic yards and risk running short by 0.07 — a small shortfall, but exactly the kind that leaves one corner of a patio unfinished. Our guide to how many cubic yards of concrete you need for a slab works through more slab sizes at the standard 4-inch depth.

Worked Example 3: A Round Patio, 10 Feet Across, 4 Inches Deep

Round areas use the circle formula — area = π × radius² — before the same divide-by-27 step:

  1. Radius: 10 feet across means a radius of 5 feet.
  2. Area: 3.1416 × 5² = 3.1416 × 25 = 78.54 square feet.
  3. Depth in feet: 4 inches ÷ 12 = 0.33 feet.
  4. Volume in cubic feet: 78.54 × 0.33 = 26.18 cubic feet.
  5. Volume in cubic yards: 26.18 ÷ 27 = 0.97 cubic yards.
  6. Order: round up to 1 cubic yard.

A round patio 10 feet across needs almost exactly the same concrete as the 10 × 10 square slab in Example 1 — 1 cubic yard covers either one.

Cubic Feet to Cubic Yards: Quick Reference

Cubic feetCubic yards
271.00
542.00
813.00
1003.70
1355.00
27010.00

For any number not in the table, divide cubic feet by 27. Our full guide to converting cubic feet to cubic yards explains the divide-by-27 rule in detail, including how it works for bagged materials.

Common Mistakes When Calculating Cubic Yards

  • Using inches as feet. The single most common error. A 3-inch depth entered as 3 feet gives an answer twelve times too large. Always divide inches by 12 first.
  • Forgetting to divide by 27. Length × width × depth gives cubic feet, not cubic yards. A 25 cubic foot slab is 0.93 cubic yards — ordering 25 cubic yards would be 27 times too much.
  • Rounding down. Cubic yards are sold in whole or half-yard amounts, and you cannot pour 0.93 of a yard and finish the job. Always round up.
  • Skipping the waste allowance. Uneven ground, spillage, and formwork absorb 5–10% of every pour. On small jobs it rarely changes the order; on a driveway it can mean a second delivery.

Frequently Asked Questions

How do I calculate cubic yards for a slab?
Multiply length × width × depth, with all three measurements in feet, then divide by 27. A 10 ft × 10 ft slab 3 inches deep is 10 × 10 × 0.25 = 25 cubic feet, and 25 ÷ 27 = 0.93 cubic yards — order 1 cubic yard.

How many cubic feet are in a cubic yard?
There are 27 cubic feet in one cubic yard, because a cubic yard is a 3 ft × 3 ft × 3 ft cube and 3 × 3 × 3 = 27.

How do I convert inches to feet for the depth?
Divide the inches by 12. So 3 inches = 0.25 feet, 4 inches = 0.33 feet, and 6 inches = 0.5 feet. Use the converted figure in the formula.

Should I add extra for waste?
Yes — add 5–10% to the calculated volume, then round up. On a 3.70 cubic yard patio, a 10% allowance gives 4.07 cubic yards, so you would order 4.5 cubic yards.

How much area does one cubic yard cover?
One cubic yard covers 81 square feet at 4 inches deep, 108 square feet at 3 inches deep, and 54 square feet at 6 inches deep. Our coverage guide has the full table.

Can I calculate cubic yards for a round area?
Yes. Find the area with π × radius², multiply by the depth in feet, then divide by 27. A round patio 10 feet across and 4 inches deep needs 0.97 cubic yards — order 1.

Leave a Comment

Your email address will not be published. Required fields are marked *